In June 2012, while I was still visiting family with the kids, Peter replaced the counter top, extending it out over the dishwasher we had been using for 2 years without it being covered by anything. He also installed a tile back splash at that point. A few weeks after I got home, we installed a microwave / vent hood combo (we had no vent hood up until that point). The new counter top and getting the microwave off the counter gave me an extra ~4' of counter space - approximately doubling my counter space!
At some point this year we also ripped off the plastic corner protectors. We think they're tacky looking and we knew we wanted them gone before we painted. A few weeks ago Peter primed the crown molding (which is staying in place, but we want it changed from brown to white).
Today, Peter touched up some crack-filling in the corners and filled in the holes in the wall. He also removed the baseboard (we're replacing it with white colonial baseboard). I primed the remaining four cupboard doors, put a coat of paint on the last two cupboards, and caulked the cracks between pieces of crown molding. Peter also took the baseboard heater off the wall. For some reason, the heaters in this house were all installed above the baseboard (off the floor by about 2"). Weird. Anyway, we've been slowly lowering them as we renovate.
The plan for the next week is to:
- finish painting the remaining cupboards and doors
- finish installing dishwasher (it's still just sitting under the counter)
- purchase and install new hinges and door pulls
- 2 coats of paint on the crown molding
- prime and paint walls (we're going for a medium taupe - still need to purchase paint)
- install, caulk, and paint new baseboards and window trim
- purchase and install new light fixtures (3)
- purchase and install new thermostats