Thursday, November 4, 2010

Bathroom renovation - complete (almost)

This update is a bit late, but we finally finished the bathroom renovations in time for all our company to arrive. In fact, Peter's even done quite a bit of work on the downstairs bedroom, but that's for another post.

During the last update, we had the walls primed, the shower half-installed, and no sink or toilet. Since then we have installed a sink and toilet, painted the walls, and finished installing the floor. Voila!

Here is a list of what's left on the bathroom. I would really like to get these items checked off as soon as possible:
  1. Doorknob (bought but not yet installed)
  2. Touch up paint on trim
  3. Last few tiles by door (waiting to hear from flooring expert whether we should wait until laminate is laid in hallway)
  4. Mirror (still need to purchase)
  5. Install towel racks and toilet paper holder (bought but not yet installed)

2 comments:

Eleni said...

Toilet seat.... don't forget about the toilet seat! lol

Angela said...

You are very observant! lol. The toilet seat is already in place, I just took the pictures before it was on.